Start with the work you want more of
“All companies that use metal” is too broad a target group. It does not help you decide which company to call first or which RFQ to leave unquoted. A useful buyer profile starts with the machine shop’s own production.
Review a few jobs that went well and delivered the margin you wanted. Record the manufacturing process, material, part size, batch size, required finishing operations and ordering pattern. Also consider what worked: were the drawings and specifications complete, were revisions controlled, and did materials arrive on time?
The aim is to identify work your machine shop can price and manufacture in a controlled way, rather than simply finding copies of your largest existing customer. If your workload is already concentrated in one end customer or industry, avoid increasing the same dependency without noticing.
Make your machine list meaningful to a buyer
A machine’s make and year alone do not tell a buyer whether their part is a good fit. Define what you can do on that machine with your current fixtures, tools, skills and measurement methods.
Separate work you have manufactured and verified from work that still needs assessment. Do not turn the tightest tolerance you have ever achieved into a general promise for all production. Record the material, part geometry and measurement method to which the information applies.
NIST’s MEP Supplier Scouting request separates technical information, such as processes, materials and tolerances, from commercial information, such as quantities and delivery terms. The same distinction helps when creating a buyer profile. Source: NIST MEP, Supplier Scouting.
| Scope | What to record |
|---|---|
| Process | The operation you want to take responsibility for, and any subcontracted operations required. |
| Part | Material, size, geometry and handling constraints. |
| Batch | A suitable batch size and the share of work taken up by setup. |
| Verification | Measurement, documentation and approvals required by the customer. |
| Delivery | The product to be packed, delivery frequency and practical transport constraints. |
Record the work you are not looking for
An exclusion saves time only if it is visible before you calculate a quotation. It might be a material you do not process, a buyer’s required approval you do not hold, or an operation you cannot take responsibility for supplying.
Missing information does not automatically mean rejection. “Not suitable” and “not yet known” are different states. If the part size is missing, ask for it. If it exceeds the machine’s and fixture’s actual working envelope, that is a clear constraint.
Look for evidence of a possible need
Once your own shop’s scope is clear, look for companies whose products or production could involve this kind of work. A public product image, spare-parts catalogue or the buyer’s description of its manufacturing chain may give you a reason to investigate.
Keep observations and conclusions separate. “The company manufactures pumps” is an observation you can check on a public website. “The company buys shafts externally” is an assumption unless a source or the buyer confirms it. Do not turn an assumption into a confirmed need on your buyer list.
Record one short reason and its source for each company. If the same reason would fit a hundred other companies equally well, narrow your scope further. An industry code or revenue figure alone does not tell you who buys that operation.
Find out who buys and how suppliers are approved
A company that fits technically may still be the wrong contact target. Parts might be purchased by a parent company, an assembler or a second-tier supplier. Find out where the decision to outsource manufacturing is made.
The first conversation may aim to confirm just three things: whether the operation is bought externally, who is responsible for suppliers, and how a new supplier can be considered. Sending a machine list becomes useful once you understand what the buyer is trying to solve.
Ask how work would start. Is approval required before an RFQ, a trial order before series production, or an estimate of capacity for the next project? The article on becoming a second-source supplier shows how to agree a limited first step without promising to transfer the whole purchasing requirement.
Choose a small, well-supported worklist
Sort the first companies into three groups: evidence supports their fit, their fit needs investigation, or a known exclusion applies. Do not assign precise scores to missing technical information. It matters more to see what must be confirmed next.
For example, choose five companies with a reasoned basis for further work. Five illustrates the method here; it is not a sales target. Give each one a next task: establish purchasing responsibility, check the part family, or ask permission to send a technical introduction.
Include the timing of capacity. Work that fits a machine already fully booked for the coming months is a different opportunity from work that fits a shift about to become available. A machine-specific utilisation calculation helps identify which machine’s hours need a buyer.
Refine the profile as you learn
Record why a company is unsuitable as well. If several buyers need a complete assembly while you offer only one machining operation, change the search criteria. Finding more of the same companies will not help.
Do not change the profile after a single negative reply. Distinguish technical mismatch, the wrong contact person and a buyer who has no current need. Each calls for a different action: remove the company from the list, find the responsible person, or agree when to return to the discussion.
You should be able to hand a good buyer profile to another person without a long verbal explanation. They should understand what you are looking for, why a company is on the list and which information is still missing.
When your buyer profile is ready